| Customization: | Available |
|---|---|
| After-sales Service: | 3 |
| Warranty: | 3 |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency

| Specifications | |
| Dimension | 11500x2500x3900mm |
| Wheelbase | 7,500mm+1,310mm+1,310mm |
| Payload | 40T |
| Tare weight | 10T |
| G.V.W.R. | 50,000kg |
| Function | Transport Fuel, Oil, Diesel |
| Tank | |
| Volume | 40000L |
| Thickness(mm) | Material Q235 carbon steel Tank body and separate compartment plate: 5mm; Dish end plate: 6mm; |
| Welding standard | All welding are to be done by qualified welder per applicable national standard |
| Compartment | 3 compartment |
| Manhole cover | 3 unit, Safety manhole with breath valve, diameter 500mm. |
| Discharge valve | 3 inch seamless steel tube, 6m |
| Tanker body test | Hydro static test to 5 psi (35 Kpa) on each compartment |
| Running System | |
| Axle | 13Ton, 3Axles |
| Tire | 12R22.5, 12 pcs, ZW brand |
| Rim | 9.0*22.5 steel disc wheel, 10 holes ISO, 12 pcs |
| Suspension system | Mechanical Suspension |
| Steel Spring | 10/10/10 leaf spring with 90mm(W) *13mm(thickness) |
| Electrical System | Chinese standard 24V lighting system |
| Brake system | Dual line pneumatic brake, SAE hose and connector |
| Brake air chamber | 6 units T30/30 spring brake chambers |
| Emergency relay valve | Wabco relay valve (brand-new trailer with the brand) |
| King Pin | 2" or 3.5", bolt type, JOST brand (brand-new trailer with the brand) |
| Landing Gear | 28ton heavy duty landing Gear, JOST brand (brand-new trailer with the brand) |
| Accessories | |
| Tool box | 1pc, standard size |
| Fire extinguisher | 2 units per trailer |
| Handrail | mechanical controlling |
| Walkway | Anti-skid walk way from rear to first manhole |
| Ladder | available |
| Spare wheel carriers | 2 pcs |
| Electrical system | 1. Voltage: 24v 2. Receptacle: 7 ways (7 wire harness) |
| Tail lamp with turn signal, brake light & reflector, side lamp etc. | |
| One set 6-core electric cable protected by PVC conduit on main frame | |
| Paint | Shot blast at Standard SA 2.5 prior to application of primer, polyurethane top coat. Total DFT not less than 100um, A layer of anti-rust paint, two-layer finish. Waxed before delivery. |
| Packing | Nude package |
